Back Home
This report is designed for data analysis. Please use the Operation reports from the first section of the main page for normal research.
High Top
YearOperation NameNumberTypeOpeningDistrictCityCountyCompany NameRailroad Shipments (tons)Railroad to MineTruck Shipments (tons)Total Production (tons)Days WorkedEmployeesNotes
1938High Top Mine6 LackawannaHigh Top Coal Co.0Truck 12,7322,7328411Coal prepared by Ace Coal Co.
1939High Top Mine6 LackawannaHigh Top Coal Co.0Truck 15,1895,18915518 
1940High Top Mine6 LackawannaHigh Top Coal Co.12,4124,46016,88225821 
1941High Top Mine6 LackawannaHigh Top Coal Co.9,2723,09112,36321624 
1942High Top Mine6 LackawannaHigh Top Coal Co.11,0291,09212,12125216 
1943High Top Mine3 LackawannaHigh Top Coal Co.8,5881,51510,10327213Transferred from 6th District.
1944High Top MineDrift3 LackawannaHigh Top Coal Co.5,83706,1442758 
1945High Top MineDrift3 LackawannaHigh Top Coal Co.2,1541,1103,2641307 
1946High Top Mine3Jessup 2LackawannaHigh Top Coal Co.81991910615Coal prepared at Moosic Mountain Breaker, 2nd District.
1947High Top Mine3Jessup 2LackawannaHigh Top Coal Co.7760776586Coal prepared at Moosic Mountain Breaker.

Note 1: Added, does not appear in the mine inspection report.

Note 2: From a list of Anthracite Operators. This may not be the operation location.